Tanzania nears $280mn Turkish loan to close funding gap on SGR phases 3 and 4
Tanzania is in the final stages of negotiations with Türk Eximbank, Turkey’s state-owned export credit agency, for a $280mn loan to close a funding gap on the third and fourth phases of its Standard Gauge Railway (SGR), part of a $1.6bn financing requirement for the two phases, Daily News reported.
The negotiations took place in Antalya, Turkey, on the sidelines of the 31st UN Climate Change Conference (COP31), with Finance Minister Khamis Mussa Omar leading the Tanzanian delegation and Türk Eximbank general manager Ali Güney representing the lender.
The two phases cover about 430 kilometres between Makutupora and Isaka. Tanzania has secured $1.32bn in export credit agency-backed financing towards that requirement, leaving a $280mn gap, according to Daily News. That comes on top of $462mn in commercial bank and development finance institution loans for the two lots signed in 2023. Güney said the bank’s board was expected to consider the financing request at a meeting this month.
The electric-powered railway is designed to provide an alternative to diesel-powered transport, reduce transport costs and improve trade links between Tanzania and neighbouring countries.
“The SGR is a major infrastructure project covering more than 2,000 kilometres. It aims to connect the coastal port city of Dar es Salaam with the western regions of Mwanza and Kigoma and neighbouring countries, including Rwanda, Uganda, Burundi and the Democratic Republic of Congo,” Omar said, as quoted by Daily News.
The railway is being built in sections, with the first two, linking Dar es Salaam to Makutupora via Dodoma, in operation since June 2024. Omar said the sections had been well received by the public.
Güney said the bank was also exploring financing opportunities in other sectors, including roads and bridges, as part of efforts to expand economic and commercial cooperation between Tanzania and Turkey.
The two countries aim to raise bilateral trade to $1bn, a target set by President Samia Suluhu Hassan and Turkish President Recep Tayyip Erdoğan in 2024, from $284mn that year.
As IntelliNews reported, Tanzania signed a $1.2bn commercial financing facility on November 4 to fund construction of Lot 6, a 411-kilometre SGR section running west from Tabora, where Lot 3 ends, to Kigoma. The facility, backed by an $800mn African Development Bank partial credit guarantee, the lender’s largest to date, was provided by a nine-bank syndicate co-arranged by Deutsche Bank (XETRA:DBK, NYSE:DB) and Société Générale (EPA:GLE), with participation from HSBC HSBA, Commerzbank
CBK, Nedbank
NED, Stanbic Bank Tanzania, First Abu Dhabi Bank
FAB, FirstBank UK and Bank of Africa UK.