TheNewswireTheNewswire

Pinnacle Commences Underground Delineation Drilling Program at El Potrero

Refinitiv3 minutos de lectura

(TheNewswire)

VANCOUVER, BRITISHCOLUMBIA, May 05, 2026 – TheNewswire- (TSXV:PINN, OTCQB: PSGCF, Frankfurt: P9J) – Pinnacle Silver and GoldCorp. ("Pinnacle" or the“Company") is pleased to announce that the rehabilitation anddrill station preparation in the historic underground mines on thehigh-grade El Potrero gold-silver property in Durango, Mexico issufficiently advanced to commence the underground delineation drillingprogram.

The program is starting at the Pinos Cuates mine, whereten drill stations have been prepared on the two levels of the mine– three stations, for 21 holes and 409 metres on the upper level,and seven stations, for 46 holes and 915 metres on the main level –for a total of 67 holes and 1,324 metres.

As the drilling is conducted at Pinos Cuates,rehabilitation and drill station preparation will be completed at theDos de Mayo mine, where 6 drill stations for 35 holes and 887 metresare planned.  At La Dura mine, 4 drill stations for 6 holes and 205metres are planned.  The entire program currently entails 2,416metres in 108 NQ-size holes, subject to modifications as itprogresses.

“The commencement of the underground drilling programat El Potrero is a major milestone as it will significantly de-riskthe project on the way towards a formal production decision later thisyear,” stated Robert Archer, President and CEO of Pinnacle. “Oursystematic underground channel sampling, consisting of almost 900samples, gave us a good indication of the location and tenor ofgold-silver mineralization, yielding individual assays up to 85.1 g/tAu and 520 g/t over 0.5 metres in the upper level of Pinos Cuates. Now the close-spaced drilling will give us a better sense of theoverall size, shape and grade of the mineralized zones.

Surface drilling is being planned to immediately followthe underground program and will fill in gaps between the mines inaddition to testing along strike on the Dos de Mayo vein and othermineralized veins such as El Capulin and La Estrella.  The combinedresults will then be used to generate an internal resource estimatethat will, in turn, be used to develop a preliminary mine plan.”

Based upon the systematic channel sampling in the threehistoric mines, Pinnacle geologists have constructed 3D models foreach to lay out the drill program.  A screenshot of the Pinos Cuatesmodel can be seen in Figure 1 below.  As the underground workings aremostly within or adjacent to the Dos de Mayo vein, drill holes will beshort and designed to cut the vein and establish the contacts and veinthickness.  Drill stations are 12.5 metres apart within the bettermineralized areas, with spacing increasing as they step out alongstrike.  At each drill station, several holes will be drilled atvarying angles in a fan pattern up and down dip on the vein (seeFigure 1).

Drill core will be logged and split with a diamond sawon site, and samples of the half-core delivered to the SGS Lab inDurango for analyses.

Click Image To View Full Size

Figure 1: 3D model of Dos de Mayovein in the Pinos Cuates mine showing mine workings and proposed drillholes (colours denote priority)

Qualified Person

Mr. Jorge Ortega, P. Geo, a Qualified Person as definedby National Instrument 43-101, and the author of the NI 43-101Technical Report for the Potrero Project, has reviewed, verified andapproved for disclosure the technical information contained in thisnews release.

About the Potrero Property

El Potrero is located in the prolific Sierra MadreOccidental of western Mexico and lies within 35 kilometres of fouroperating mines, including the 4,000 tonnes per day (tpd) CiénegaMine (Fresnillo), the 1,000 tpd Tahuehueto Mine (Luca Mining) and the250 tpd Topia Mine (Guanajuato Silver).

High-grade gold-silvermineralization occurs in a low sulphidation epithermal breccia veinsystem hosted within andesites of the Lower Volcanic Series and hasthree historic mines along a 500 metre strike length.  The propertyhas been in private hands for almost 40 years and has never beensystematically explored by modern methods, leaving significantexploration potential.

A previously operational 100 tpd plant on site can berefurbished / rebuilt and historic underground mine workingsrehabilitated at relatively low cost in order to achieve near-termproduction once permits are in place. The property is road accessiblewith a power line within three kilometres.

Pinnacle will earn an initial 50% interest immediatelyupon commencing production.  The goal will then be to generatesufficient cash flow with which to further develop the project andincrease the Company’s ownership to 100% subject to a 2% NSR.  Ifsuccessful, this approach would be less dilutive for shareholders thanrelying on the equity markets to finance the growth of theCompany.

About
Pinnacle Silver and Gold Corp.

Pinnacle is focused on the development of precious
metals projects in the Americas.
 The high-grade Potrero gold-silver project in Mexico’s Sierra
Madre Belt hosts an underexplored low-sulphidation epithermal vein
system and provides the potential for near-term production. In the prolific Red Lake District of northwestern Ontario, the Company owns
a 100% interest in the past-producing, high-grade Argosy Gold Mine
and the adjacent North Birch Project
with an eight-kilometre-long target horizon.  With a
seasoned, highly successful management team and quality projects, Pinnacle Silver and Gold is
committed to
building long-term, sustainable value for shareholders.

Signed: “Robert A. Archer”

President & CEO

For
further information contact:

Email:        info@pinnaclesilverandgold.com

Tel.:  +1 (877) 271-5886 ext. 110

Website: www.pinnaclesilverandgold.com

Neither the TSXVenture Exchange nor the Investment Industry Regulatory Organizationof Canada accepts responsibility for the adequacy or accuracy of thisrelease.

Copyright (c) 2026 TheNewswire - All rights reserved.

Lea el artículo completo
Cree una cuenta gratuita para acceder a este artículo, además de a otros miles que se publican a diario.