bne Intellinewsbne Intellinews

Shell starts up Malaysia's Rosmari-Marjoram sour gas project to feed Bintulu LNG

3 menit membaca

Shell SHEL has started gas production from the Rosmari and Marjoram deepwater fields off Sarawak, adding feedgas for Malaysia's Bintulu LNG export complex, the company said on November 17.

The fields lie about 220 km off the coast in around 800 metres of water. Their gas is sour, with a high hydrogen sulphide content, and is piped 207 km to a new onshore plant in Bintulu, where the hydrogen sulphide is removed before the gas is sent on to the Petronas LNG Complex.

Shell has said the development is designed to produce 800mn cubic feet per day of gas, or about 22.7mn cubic metres (mcm) per day. Its November 17 statement gave no initial flow rate and no timetable for reaching plateau.

Sarawak Shell Berhad (SSB), a Shell subsidiary, operates the project with a 71% interest. Its partners are Petronas Carigali, the upstream arm of state-owned Petronas; INPEX Malaysia E&P 2E, a unit of Japan's Inpex 1605; and Searah, a joint venture between Petronas and Italy's Eni (BIT:ENI). Shell did not give the partners' individual stakes.

Inpex's position comes from Block 2E, which TotalEnergies (EPA:TTE) agreed in July to sell to the Japanese company for $350mn. TotalEnergies said at the time that its 85% of the block amounted to an effective 8.5% of the Marjoram field.

'We have strong expertise in this basin, and the start-up of Rosmari-Marjoram contributes to production growth into the 2030s,' said Peter Costello, Shell's president of upstream. Siti Sulaiman, Shell's country chair in Malaysia, called the start-up an important milestone and a reflection of the company's partnership with Petronas, the federal government and the Sarawak state government.

The fields were discovered in 2014, and SSB and Petronas Carigali took the final investment decision in September 2022, when they targeted first gas in 2026. The project has come on stream in the year originally planned.

The development consists of a subsea tie-back, an unmanned wellhead platform, the pipeline to shore and the onshore plant, which Shell describes as SSB's largest onshore project in Sarawak since the late 1970s. The platform runs on solar panels and batteries that can power it for up to three days, with diesel generators as back-up. The onshore plant draws on Sarawak's mainly hydropower grid and buys renewable energy certificates, which Shell says makes its electricity supply 100% renewable.

Rosmari-Marjoram is one of several projects Malaysia is relying on to offset decline at older fields feeding Bintulu, whose nine trains have a combined capacity of nearly 30mn tonnes per year (tpy). The Petronas-operated Jerun field, which started up in 2024, has capacity of around 550mn cubic feet per day. Petronas aims to hold its own output close to 2mn barrels of oil equivalent per day (boepd) between 2026 and 2028.

Shell is also looking for more gas in the basin. It has hired Norway's TGS to shoot a new 3D seismic survey over Block SK437 off Sarawak, Upstream reported on November 10. Shell also has interests in the producing Timi and Gorek fields off the state.

The project comes on stream while Petronas and Petroleum Sarawak (Petros) are still fighting over who controls the distribution of gas in Sarawak. A joint declaration by the federal and state governments in May 2025 commits 1.2bn cubic feet per day to the state, with the rest left to Petronas for LNG export, but no final commercial agreement has been signed and the Federal Court is due to hear the case over five days from January 25, 2027.

NewsBase Horizon, our intelligence and advisory division, believes that Rosmari-Marjoram's full design capacity of 800mn cubic feet per day, equal to two-thirds of the state's 1.2bn cubic feet per day allocation, could give Petronas more room over the next 12 months to supply Bintulu's trains alongside Sarawak's domestic demand. How quickly the field ramps up, and whatever settlement the court case produces, will decide how much of that headroom is real.

Baca artikel lengkap
Dapatkan akses tak terbatas ke artikel dari bne Intellinews dan semua sumber berita lainnya di TradingView.