ORB + Fib Breakout Signals (Strategy)ORB + Fib Breakout Signals (Strategy)
An opening-range breakout (ORB) strategy combined with Fibonacci levels and a
defined risk model. It marks the session's opening range, goes long on a break
above the range high and short below the range low, then manages the trade with
an ATR-based stop, an R-multiple target, and an optional breakeven move.
How it works
- Opening range — builds the high/low of the first 15/30/60 minutes of your
chosen session (timezone configurable).
- Entry — long on
ストラテジー























