bne Intellinewsbne Intellinews

Panama Canal lifts daily transits to 34, raises Neopanamax draught to 50 feet

1 분 소요

The Panama Canal has lifted daily transit capacity to 34 ships and deepened the draught allowed at its Neopanamax locks to 50 feet, the canal authority said on November 9.

The Panama Canal Authority (ACP), the state body that runs the waterway, said in Advisory to Shipping A-42-2026 that the maximum allowable draught at the Neopanamax locks rises to 15.24 metres, or 50 feet, with immediate effect and until further notice. Daily booking slots for Super-category vessels at the Panamax locks go up from 18 to 19, taking total capacity across both lock systems to 34: 10 Neopanamax slots, 19 Super and five Regular. The authority put the change down to current and projected Gatun Lake levels.

Two months ago the canal was moving the other way, cutting its overall daily cap from 34 ships to 32 and holding Neopanamax draught at 48 feet only by postponing a planned reduction to 47.5 feet as El Nino raised the risk of another water squeeze. Administrator Ilya Espino de Marotta said in September that restrictions could reach about 29 transits a day by February or March, telling AFP she did not expect a repeat of the cuts imposed during the 2023 episode. The 50-foot limit now set is two feet above the level the canal was defending then.

The waterway handles an estimated 3-5% of global maritime commerce and depends on rainfall to move ships through its locks; the 2023-2024 drought cost it 2,700 deep-draught transits and 88mn tonnes of cargo. Panama is counting on the proposed Rio Indio reservoir, put at $1.5bn, to secure water for the canal and for the country's own supply, while the authority builds out ports and logistics to lean less on transit tolls.

The extra Super slot goes on offer through the booking system - at auction for booking dates between November 12 and 17, under special competition for November 18 to 23, and from November 24 at the opening of the second period competition. A reservation remains the only way to guarantee a transit date, the ACP said, and ships arriving without one risk very long waits.

기사 전문을 읽어보세요
TradingView에서 bne Intellinews 비롯한 모든 뉴스 소스의 기사에 무제한으로 액세스하세요.