ATR measures a price-distance scale. R measures the planned structural risk.
If the target is 2 ATR but the logical stop is 1.5 ATR away, the gross reward-to-risk is about 1.33—not 2. Trading costs can reduce it further.
The correct response is not to move the stop into an invalid place just to improve the displayed ratio. Freeze the entry, structural invalidation, target rule and cost assumptions first. Then accept the arithmetic, even when the result is a blocked plan.
This is a planning example, not a trade signal or a claim of profitability. Risk, position size, liquidity and the full GrowthX checklist still require separate review.
If the target is 2 ATR but the logical stop is 1.5 ATR away, the gross reward-to-risk is about 1.33—not 2. Trading costs can reduce it further.
The correct response is not to move the stop into an invalid place just to improve the displayed ratio. Freeze the entry, structural invalidation, target rule and cost assumptions first. Then accept the arithmetic, even when the result is a blocked plan.
This is a planning example, not a trade signal or a claim of profitability. Risk, position size, liquidity and the full GrowthX checklist still require separate review.
Penafian
Maklumat dan penerbitan adalah tidak bertujuan, dan tidak membentuk, nasihat atau cadangan kewangan, pelaburan, dagangan atau jenis lain yang diberikan atau disahkan oleh TradingView. Baca lebih dalam Terma Penggunaan.
Penafian
Maklumat dan penerbitan adalah tidak bertujuan, dan tidak membentuk, nasihat atau cadangan kewangan, pelaburan, dagangan atau jenis lain yang diberikan atau disahkan oleh TradingView. Baca lebih dalam Terma Penggunaan.
