TradingViewTradingView

Pinnacle Silver and Gold Corp. (PINN) Reports Up to 5.75m True Width

閱讀1分鐘

Pinnacle reported underground drilling results at its Potrero property, including 5.75m true width grading 4.38 g/t Au and 57 g/t Ag. Surface drilling is planned for Q1 2027; results will support an internal resource estimate.

Material Details

#DetailAI Analyst View
15.75m true width at 4.38 g/t Au, 57 g/t AgDemonstrates a substantial mineralized width, relevant to future resource estimation and mine planning.
24.33m true width at 7.18 g/t Au, 165 g/t AgA high-grade intercept supports continuity of gold-silver mineralization; no resource estimate is yet reported.
3Hole EPUG26085: 8.99 g/t Au, 222 g/t Ag over 3.73m true widthConfirms mineralization around a previously reported high-grade channel sample, though the intercept is localized.
4Surface drilling planned for Q1 2027Could test gaps between historic mines and extensions along the vein; results are a future catalyst.
5Internal resource estimate planned after drillingA quantified resource could clarify project scale and inform a preliminary mine plan.

Context by AI Analyst

This is an exploration-stage update that adds follow-up drill results to previously reported high-grade intersections, rather than a defined resource or production milestone. Surface drilling planned for Q1 2027 and the subsequent internal resource estimate would be needed to establish continuity and potential project scale.

Based on the original press release from Pinnacle Silver and Gold Corp. distributed by TheNewswire.

免責聲明
閱讀全文
建立免費帳戶,即可閱讀本文以及每天發佈的數千篇文章。